Tight Access Footing
Footings for narrow easements, tight backyards and sites others can't reach.
- Machinery
- 1.7t excavator + 820mm dumper
- Best for
- Side-gate and rear-yard access
- Service areas
- Eastern Suburbs · North Shore · The Hills District
Purpose-built for the sites others turn down.
Our C85 T5 tracked dumper and 1.7-tonne compact excavator are purpose-built for the sites that standard excavators drive past. If your job is behind a house, up a narrow side path or through a single-brick gate, this is what we do.
The C85 T5 fits through a standard single side gate, and the 1.7-tonne excavator can be walked into almost any residential backyard in Sydney.
That combination means we can excavate footings, run services and remove spoil from sites that would otherwise require hand-digging or a crane.


820mm is the number that decides the job.
A standard residential side gate sits around 900mm. Conventional excavation gear doesn't fit through it, which is why quotes for rear-yard work so often come back with hand-digging in them, or a crane lifting a machine over the house.
On a rear-yard job the digging is rarely the hard part — getting the spoil off the block is. The tracked dumper cycles it out in loads through the same gate the excavator walked in through, which is what makes the job possible without a crane over the roof or a chain of wheelbarrows.
The route in gets planned before anything drives over it: track mats where the surface has to survive, staging so the machine isn't crossing the same ground twice, and a light excavator on soft going.
When you'd call us
- Rear-yard footings for an extension or granny flat
- Access only through a side gate or a narrow path
- Excavation on a shared or services easement
What the scope typically covers.
Narrow-gate access
Sites accessed through 900mm side gates and pathways.
Rear-yard footings
Extensions, granny flats and pool footings behind existing homes.
Easement excavation
Precise excavation on shared and services easements.
Spoil removal
Tracked dumper cycles spoil through tight sites without vehicle damage.
What this looks like on the ground.
The same four stages, whatever the site.
- 01
Site Assessment
On-site consultation: access constraints, ground conditions, services location, feasibility and machinery selection.
- 02
Planning & Approvals
Scope confirmation, council/stormwater approvals where required, fixed-price proposal and program.
- 03
Excavation & Civil Works
Staged excavation, retaining, stormwater or sewer works using the right-sized machine for the access available.
- 04
Completion & Handover
Compliance checks, site clean-up, handover documentation and ongoing support.
Why clients bring this work to us.
Purpose-built dumper
The C85 T5 goes through a standard single side gate.
1.7-tonne excavator
Compact, precise, and easy on soft ground.
Minimum surface damage
Track mats and careful staging protect existing surfaces.
About tight access, specifically.