Our services

Stormwater Systems

On-site detention, pits and drainage — engineered to council standard.

Machinery
5.5t excavator
Best for
Council-spec drainage
Service areas
Eastern Suburbs · North Shore · The Hills District
Overview

Stormwater done properly the first time.

We build complete stormwater systems for Sydney residential and commercial sites — including on-site detention (OSD) tanks, pits, headwalls and pipe runs — to council standard and built to survive the next twenty-five years, not the next storm.

Stormwater is one of the easiest jobs to do badly. Undersized pipes, sloppy falls or the wrong pit spec and a compliance inspection becomes a re-dig at your expense.

We work from the engineer's plans, verify falls with a laser level, and hand back a system that passes inspection first time — with the documentation to prove it.

Stormwater Systems
Stormwater Systems — on site
About the service

What a stormwater job actually involves.

Most stormwater work starts one of two ways: a condition attached to a DA, or something you can see after heavy rain — water pooling against the house, a pit that backs up, a downpipe running to nowhere. The fix is rarely just the part you can see.

A complete system is the pits, the pipe runs at the correct grade, and — on blocks that can't discharge to the street — an absorption trench sized to how fast that soil actually takes water. On-site detention adds a tank that holds the peak of a storm and releases it slowly, so the street system isn't hit with everything at once.

Drainage is plumbing work and the digging is ours as well, so the pipework and the excavation are the same crew on this job. It also means the sequence gets respected: grades checked and the system inspected before it disappears under backfill. Burying it early is how a stormwater job ends up being dug twice.

When you'd call us

  • New hard surface — a roof, driveway or extension — that council wants water managed for
  • Water pooling, or running toward the building, after rain
  • No fall to the street, so discharge has to be handled on the block
What's included

What the scope typically covers.

OSD tanks

On-site detention tanks sized to the hydraulic report.

Stormwater pits

Junction, silt and grated pits installed to spec.

Pipe runs

PVC and RCP runs at correct grade, bedded and backfilled properly.

Absorption trenches

For sites without street connection — sized to soil percolation.

On site

What this looks like on the ground.

How it runs

The same four stages, whatever the site.

  1. 01

    Site Assessment

    On-site consultation: access constraints, ground conditions, services location, feasibility and machinery selection.

  2. 02

    Planning & Approvals

    Scope confirmation, council/stormwater approvals where required, fixed-price proposal and program.

  3. 03

    Excavation & Civil Works

    Staged excavation, retaining, stormwater or sewer works using the right-sized machine for the access available.

  4. 04

    Completion & Handover

    Compliance checks, site clean-up, handover documentation and ongoing support.

Why choose us

Why clients bring this work to us.

Council-compliant

Built to the engineer's drawings and stamped for handover.

Correct falls

Laser-verified grades on every run — no pooling, no backflow.

Fixed price

One clear scope and price before any excavation begins.

Question & answer

About stormwater, specifically.

Often yes — new OSD tanks and connections almost always require council or hydraulic engineer sign-off. We'll tell you upfront what your job needs.

Something not covered here? Call (02) 9090 4518 and ask.

Get in touch

Have a difficult site? Let's talk before you dig.